Asset 4

Interconnection Requirements – City of Lake Worth Beach Electric Utility

The City of Lake Worth Beach Electric Utility—your Citizen Owned Energy—supports renewable energy by providing clear requirements for customers who wish to interconnect their systems. Through our Net Metering Program, residents can offset energy use with solar or other renewable sources, while ensuring compliance with Florida state rules. In alignment with national standards, we also publish our Facility Interconnection Requirements (FAC-001) and Interconnection Studies (FAC-002), which outline the technical specifications, safety protocols, and reliability assessments needed for grid interconnection. By maintaining these transparent requirements, we make the process straightforward for customers and uphold our commitment to reliability, safety, and sustainability.

Report cover July 2025

Evaluating the Reliability and Security of the United States Electric Grid

July 21, 2025 – The U.S. Department of Energy’s latest grid reliability report reveals alarming projections for 2030. With 104 GW of firm power set to retire and insufficient replacements, the nation risks severe outages, especially as AI-driven data centers accelerate energy demand. The study calls for decisive reforms, new generation capacity, and a forward-looking strategy to safeguard national security and energy independence.