Scroll Top
Electric Rates Effective March 1, 2024

Total Energy Charges$0.11783 / kWh

RESIDENTIAL SERVICE
Customer Charge$11.08 / month
Energy Charges:First 1,000 kWhAdditional KWh
Base Energy Charge$0.07245 / kWh$0.09345 / kWh
Power Cost Adjustment$0.02438 / kWh$0.03438 / KWh
Total Energy Charges$0.09683 / kWh$0.12783 / kWh
Minimum bill:$37.00
COMMERCIAL SERVICE
Customer Charge$17.85 /month
Energy Charges:
Base Energy Charge$0.09135 / kWh
Power Cost Adjustment$0.02648 / kWh
Total Energy Charges$0.11783 / kWh
Minimum Bill Single Phase Service:$53.00
Minimum Bill Poly Phase Service:$105.00
COMMERCIAL DEMAND SERVICE
Customer Charge$136.50 /month
Demand Charge$12.60 / kW
Energy Charges:
Base Energy Charge$0.05460 / kWh
Power Cost Adjustment$0.02648 / kWh
Total Energy Charges$0.08108 / kWh
Minimum bill:$263.00
Time of Use Commercial Service
Customer Charge$31.50 /month
Energy Charges:
Off-Peak Energy Charge$0.08820 / kWh
On-Peak Energy Charge$0.27300 / kWh
Power Cost Adjustment$0.02648 / kWh
Minimum Bill Single Phase Service:$53.00
Minimum Bill Poly Phase Service:$105.00
TIME OF USE COMMERCIAL DEMAND SERVICE
Customer Charge$147.00 / month
Demand Charge$7.35 / kW
Energy Charges:
Off-Peak Energy Charge$0.06510 / kWh
On-Peak Energy Charge$0.25200 / kWh
Power Cost Adjustment$0.02648 / kWh
Minimum bill:$147.00
ELECTRIC VEHICLE CHARGING LEVEL II
Energy Charges:
Base Energy Charge$0.07245 / kWh
Power Cost Adjustment$0.02438 / kWh
Total Energy Charges$0.09683 / kWh
PURCHASE POWER COST ADJUSTMENT (PCA)
Purchased Power Cost Adjustment (PCA): A Purchased Power Cost Adjustment Charge (PCA) shall be established for a projected 3 month period for energy sales during that period as follows:

PCA = (A + B + C) / D, where:

A = The projected purchased power costs for the projected 3 month period comprised of costs such as the FMPA
Stanton 1 variable costs, the FMPA Municipal Solar Project power costs, supplemental purchased power capacity, energy and directly related costs, Lake Worth Beach electric utility power generating fuel, and transmission costs
B = A true-up amount representing the over or under recovery of purchased power costs from the prior period
C = The amount transferred to or from the Rate Stabilization Fund for the projected period
D = The projected total retail sales in MWh for the projected 3 month period

The purchased power cost adjustment charge will be reconciled quarterly and trued up between estimated costs and
billing units and actual costs and billing units.

Private Area & Street Lighting Rates
PRIVATE AREA LIGHTING
175 W Mercury Vapor$12.82 / month
400 W Mercury Vapor$20.11 / month
1,000 W Mercury Vapor$39.56 / month
100 W Sodium Vapor$10.43 / month
250 W Sodium Vapor$14.97 / month
360 W Sodium Vapor$17.90 / month
400 W Sodium Vapor$18.01 / month
48 W LED$9.45 / month
70 W LED$10.19 / month
80 W LED$10.19 / month
101 W LED$17.12 / month
110 W LED$17.12 / month
133 W LED$17.12 / month
150 W LED$17.12 / month
Wood Pole and Span$10.50 / month
Concrete Pole and Span$15.75 / month
Underground Conductors:
      Up to 150 ft$1.40 / ft / month
      150-300 ft$2.81 / ft / month
STREET LIGHTING
100 W Sodium Vapor$8.24 / month
150 W Sodium Vapor$9.80 / month
250 W Sodium Vapor$12.87 / month
360 W Sodium Vapor$15.95 / month
400 W Sodium Vapor$17.94 / month
48 W LED$9.45 / month
70 W LED$10.19 / month
80 W LED$10.19 / month
101 W LED$17.12 / month
110 W LED$17.12 / month
133 W LED$17.12 / month
150 W LED$17.12 / month
Wood Pole and Span$10.50 / month
Concrete Pole and Span$15.75 / month
Underground Conductors:
       Up to 150 ft$1.40 / ft / month
      150-300 ft$2.81 / ft / month

The lighting rates shown above do not include the Power Cost Adjustment of $0.02438 per kWh.