Lake Worth Beach Electric Utility Rates
ELECTRIC SERVICE
Public Utility Tax8%
RESIDENTIAL SERVICE
Customer Charge$10.55
First 1,000 KWH’sExcess
Base Energy = KWH$0.06900$0.08900
Power Cost Adjustment$0.03490$0.04490
TOTAL$0.10390$0.13390
Minimum bill$35.00
COMMERCIAL SERVICE
Customer Charge$17.00
All KWH’s
Base Energy = KWH$0.08700
Power Cost Adjustment$0.03700
TOTAL$0.12400
Minimum bill (Single Phase Service)$50.00
Minimum bill (Poly Phase Service)$100.00
DEMAND COMMERCIAL SERVICE
Customer Charge$130.00
All KWH’sDemand – KW
Base Energy = KWH0.05200$12.00
Power Cost Adjustment0.03700
TOTAL$0.08900$12.00
Minimum bill$250.00
REGULAR TIME OF USE COMMERCIAL SERVICE
Customer Charge$30.00
KWH’s
Energy Charge (off-peak)$0.08400
Energy Charge (On-peak)$0.26000
Minimum bill (Single Phase Service)$50.00
Minimum bill (Poly Phase Service)$100.00
TIME OF USE DEMAND COMMERCIAL SERVICE
Customer Charge$140.00
KWH’s
Energy Charge (off-peak)$0.06200
Energy Charge (on-peak)$0.24000
Demand Charge (per kW)$7.00
Minimum bill$140.00
ELECTRIC VEHICLE CHARGING LEVEL II
All KWH’s
Base Energy = KWH$0.05148
Fuel$0.03578
Capacity$0.01020
TOTAL$0.09746
Private Area & Street Lighting
PRIVATE AREA LIGHTING

Description Unit Cost per Month

175 Watt (7,000 Lumen) Mercury –Vapor Street Light Unit on Existing Pole$12.21
400 Watt (20,500 Lumen) Mercury-Vapor Street Light Unit on Existing Pole$19.15
1,000 Watt (55,000 Lumen) Mercury-Vapor Street Light Unit on Existing Pole$37.68
100 Watt (9,500 Lumen) High Pressure Sodium Vapor Street Light Unit on Existing Pole$9.93
250 Watt (27,500 Lumen) High Pressure Sodium Vapor Street Light Unit on Existing Pole$14.26
360 Watt High Pressure Sodium Vapor Street Light Unit on Existing Pole$17.05
400 Watt (50,000 Lumen) High Pressure Sodium Vapor Street Light Unit on existing pole$17.15
48 Watt LED Street Light Unit on Existing Pole$9.00
70 Watt LED Street Light Unit on Existing Pole$9.70
80 Watt LED Street Light Unit on Existing Pole$9.70
101 Watt LED Street Light Unit on Existing Pole$16.30
110 Watt LED Street Light Unit on Existing Pole$16.30
133 Watt LED Street Light Unit on Existing Pole$16.30
150 Watt LED Street Light Unit on Existing Pole$16.30
Wood Pole and span of Overhead Conductors or Pole used only for Light$10.00
Concrete Pole and Span of Overhead Conductors or Pole used only for Light$15.00
Underground Conductors up to 150 feet$1.33
Underground Conductors from 150 feet to 300 feet$2.68
STREET LIGHTING

Description Unit Cost per Month

100 Watt (9,500 Lumen) High Pressure Sodium Vapor Street Light Unit on Existing Pole$7.85
150 Watt (27,500 Lumen) High Pressure Sodium Vapor Street Light Unit on Existing Pole$9.33
250 Watt (27,500 Lumen) High Pressure Sodium Vapor Street Light Unit on Existing Pole$12.26
360 Watt High Pressure Sodium Vapor Street Light Unit on Existing Pole$15.19
400 Watt (50,000 Lumen) High Pressure Sodium Vapor Street Light Unit on existing pole$17.09
48 Watt LED Street Light Unit on Existing Pole$9.00
70 Watt LED Street Light Unit on Existing Pole$9.70
80 Watt LED Street Light Unit on Existing Pole$9.70
101 Watt LED Street Light Unit on Existing Pole$16.30
110 Watt LED Street Light Unit on Existing Pole$16.30
133 Watt LED Street Light Unit on Existing Pole$16.30
150 Watt LED Street Light Unit on Existing Pole$16.30
Description Unit Cost per Month Continued
Wood Pole and span of Overhead Conductors $10.00; or Pole used only for Light Concrete Pole and Span of Overhead Conductors $15.00; or Pole used only for Light Underground Conductors up to 150 feet $1.33. Underground Conductors from 150 feet to 300 feet $2.68
PURCHASE POWER COST ADJUSTMENT (PCA)

Purchased Power Cost Adjustment (PCA): A Purchased Power Cost Adjustment Charge (PCA) shall be established for a projected 3 month period for energy sales during that period as follows:

PCA = (A + B + C) / D

where:
A = The projected purchased power costs for the projected 3 month period comprised of costs such as the FMPA Stanton 1 variable costs, the FMPA Municipal Solar Project power costs, supplemental purchased power capacity, energy and directly related costs, Lake Worth Beach electric utility power generating fuel, and transmission costs
B = A true-up amount representing the over or under recovery of purchased power costs from the prior period
C = The amount transferred to or from the Rate Stabilization Fund for the projected period
D = The projected total retail sales in MWh for the projected 3 month period

The purchased power cost adjustment charge will be reconciled quarterly and trued up between estimated costs and billing units and actual costs and billing units.